After the issuance of a permit, is an inspection required?

Electrical work must be inspected, and the inspection must be requested at least 24 hours in advance by calling the automated IVR line at 301-755-9000 or made online at Schedule an Inspection.

Schedule an Inspection

Show All Answers

1. Is an Electrical Permit required for a low voltage device to be plugged into the existing receptacle?
2. Can the homeowner perform electrical work on his or her premises?
3. When is an Electrical Permit required?
4. Is the Electrical Permit Application available online?
5. What is the Application Process?
6. After the issuance of a permit, is an inspection required?
7. What is the cost of an Electrical Permit, and how will it be calculated?
8. What are the electrical site lighting requirements?
9. For commercial interior with use and occupancy (CU-permit), are electrical drawings required?
10. What are the electrical plan review requirements for a Building Permit?