After the issuance of a permit, is an inspection required?
Electrical work must be inspected, and the inspection must be requested at least 24 hours in advance by calling the County’s Interactive Voice Response system (IVR) at 301-755-9000, between 7 a.m. and 11 p.m., Monday through Friday, or applying online.