How do I know if I am approved and when will funds be distributed?
You will receive an email from the processing team notifying you of your award. Upon notification, you will need to sign a Grant...
You will receive an email from the processing team notifying you of your award. Upon notification, you will need to sign a Grant...
The following are exempt:
- A one-story detached accessory structure on one- and two-family dwelling properties with less than...
A permit under which no work has commenced within 180 days after issuance shall expire and become null and void. Please refer to...
The ground snow load (PG) is 35 pounds per square foot (PSF) per the Maryland Code Administration. Design snow loads shall be...
The frost depth is 2 feet 6 inches from finished grade to the bottom of the footing.
The minimum requirements are:
- Provide a copy of complete architectural/structural plans for all residential construction...
The process is as follows:
- You need to complete the Application Form.
- You need to provide a site plan showing the location...
The requirements are:
- A permit is not required if your shed is less than 150 square feet.
- You need to complete the Application...
The process is:
- You need to complete the Application Form.
- You need to provide a copy of the basement floor plans. Please...