Applying
Building Permit applications are completed online. Please go to the
ePermits Online Portal and enter the information directly into the County’s Permitting System.
Tenant Fit-Out Case Types — Commercial Use
- Work Description for CU: Family Day Care (for 9 or More Children); Assisted Living/Congregate Living (6 or more residents); General Interior Work (tenant fit-out with a new use); Paint Spray Booth (existing building)
- Work Description for CUW: General Interior Work (tenant fit-out with a new use)
Commercial Use (Not a Walk-Through):
Documents/Approvals Required with a new Use & Occupancy:
- Site/Plot Plans — Original Signature and Sealed
- Architectural Drawings — Original Signature and Sealed
- Structural Drawings — Original Signature and Sealed
- Electrical Drawings — Original Signature and Sealed
- Mechanical Drawings — Original Signature and Sealed
Commercial Use — Walk-Through:
Documents/Approvals Required with a new Use & Occupancy
- Site/Plot Plans — Original Signature and Sealed
- Architectural Drawings — Original Signature and Sealed
- Structural Drawings — Original Signature and Sealed
- Electrical Drawings — Original Signature and Sealed
- Mechanical Drawings — Original Signature and Sealed
Reviews Needed
- Health
- M-NCPPC
- Electrical
- Mechanical
- Fire
- Structural
- CIP (if applicable)
Payment
For permit, license and bond fees, view the
DPIE Fee Schedule. Customers are encouraged to pay online at
ePayments. For alternate forms of payment, visit DPIE's
Payments page.
- Permit Fee = view the DPIE Fee Schedule
- Use & Occupancy (if applicable) $ per discipline
- TPIP May Be Required.
Note
- All plans on this checklist must be provided at the time of permit application.
- Customers must comply with local municipalities and township requirements prior to starting construction.
- TPIP May Be Required.