Electrical Permits

Change in Process:  Additional Permit Types Transfer into Momentum

Effective July 15, 2024, all Building, Site Development (excluding Cell Tower/Special Utility), Fire Protection Systems, and Trade (Electrical/Mechanical) Permits must be obtained via the Prince George’s County Momentum (online) permit system. If a permit obtained in ePermits prior to July 15, 2024, has expired and has no inspections then applicants are required to submit a new application in Momentum. Requests for application extensions and permit renewals will continue to be processed in the original permit system (ePermits or Momentum). Well and Septic Permits and Department of the Environment (DOE) Permits are still applied for and issued in ePermits.

 

STOP! — PLEASE READ BEFORE YOU PROCEED

The new Momentum permitting system is live.  However, you will use the legacy ePermits online system for the following only:

  1. Cell Tower Permits
  2. Special Utility Permits
  3. Department of Environment Permits
  4. Electrical or Mechanical Permits that are associated with an existing permit in ePermits 
  5. For revisions to applications/permit prior to 5/1/23, you must utilize the existing revision process found here

For all other permits you must use Momentum by applying here.

 

Resources

TRADE MANUALS — Step-by-Step Instructions with Visuals

VIDEOS — Electrical Permits, parts 1–3

View the below videos on YouTube for assistance in completing your application.                 

 

Master Electricians are required to apply for electrical permits via the DPIE Online Electrical Process. Electrical Orientation Training is no longer required. The Master Electrician must follow the steps below in order to register and obtain access to the DPIE Online Electrical Process.

Once you submit your information, please allow up to 2 business days for verification of your registration information before access to the DPIE online electrical permit process is granted.

  1. First, complete the "Online Permit Application - Electronic Signature Acknowledgment Form"
  2. Next, register and/or create your user profile
  3. Finally, send an e-mail to DPIE at: onlineelectricalpermits@co.pg.md.us
     

The e-mail information should contain the following information:

  • Company Name
  • E-mail Address (used as the login when setting up the profile)
  • Completed Electronic Signature form
  • Scanned copy of the Master Electrician's current State of Maryland License
  • Scanned, color copy of the Master Electrician's Driver's License

Electrical revisions can only be processed by a DPIE staff member. All Electricians requesting revisions must speak with a DPIE staff member by calling 301-636-2050, option 2.

Do not forward revision requests to the “online electrical permits" email.

Please contact a DPIE staff member with your questions and/or concerns at 301-636-2050, option 2.

Access the Momentum portal.